The Clinton Street Bridge is scheduled to reopen tomorrow after being closed to vehicles since July 14, assistant civil engineer Mathew Sledjecki said. The City of Ithaca’s Water and Sewer Division closed the bridge to repair water and sewer lines on the 100 block of Clinton Street and the 100 block of Prospect Street. Posted…